Back to English HubDeployment

OpenClaw Openclaw Cloud Deployment China Comparison

Practical OpenClaw deployment guide with commands, checks, and rollback-safe steps.

Updated: 2026-03-118 min read

Best for

You already run locally and need production rollout.

Reading time

8 minutes

Expected result

You finish with a rollback-safe production release.

Execution Steps

  1. Prepare rollback first: keep previous image tag and last known-good config snapshot.
  2. Deploy with stable tags and one-variable changes per release window.
  3. Run post-release checks: service health, callback loop, and a real task execution.
  4. If checks fail, rollback immediately and capture logs before re-attempting.

Key Commands

docker compose up -d
docker ps | grep openclaw
curl http://127.0.0.1:3000

Common Risks

  • Do not release without rollback validation.
  • Do not change image, config, and model policy at once.

Frequent Failure Patterns

  • Changing too many variables at once hides root cause.
  • No rollback rehearsal extends outage recovery time.

Acceptance Checks

  • Production endpoint works
  • Critical flow passes checks
  • No persistent high-severity log error

Official Links

Related Guides